Difference between revisions of "PT Calendar Version 2.1 Upgrade"

From ADF Docs
Jump to: navigation, search
(Application Code)
Line 10: Line 10:
  
 
[[Reset ADF|Reset the ADF]] for the server and site.
 
[[Reset ADF|Reset the ADF]] for the server and site.
 +
 +
== App Configuration ==
 +
  
 
== Site Customizations ==
 
== Site Customizations ==

Revision as of 19:58, 14 May 2013

Back to PT Calendar

Overview

The following guide is upgrading from v2.0 to v2.1.

Application Code

  1. Rename directory "/ADF/apps/pt_calendar2" to "/ADF/apps/pt_calendar2_old_v2".
  2. Rename file "/ADF/apps/pt_calendar2_old_v2/appBeanConfig.cfm" to "/ADF/apps/pt_calendar2_old_v2/appBeanConfig.cfm.old".
  3. Download the PT Calendar v2.1 and exported into the "/ADF/apps/pt_calendar2/" directory.

Reset the ADF for the server and site.

App Configuration

Site Customizations

During the application implementation customizations may have been created. Check under the "/_cs_apps/pt_calendar2/" directory under you site to see if any customizations exists. If you do have site customizations, you'll need to update these accordingly.