Difference between revisions of "PT Calendar Version 4.0 Release Notes"

From ADF Docs
Jump to: navigation, search
Line 8: Line 8:
 
[[PT_Calendar_Version_4.0_Install|PT Calendar v4.0 Install Guide]].
 
[[PT_Calendar_Version_4.0_Install|PT Calendar v4.0 Install Guide]].
  
Note: PT Calendar v4.0 does not have a direct upgrade path from the v2.x or earlier Calendar App. Please see the  
+
Note: PT Calendar v4.0 does not have a direct upgrade path from the v2.x or earlier Calendar App. Please see the [[PT_Calendar_Version_3.0_Upgrade|PT Calendar v3.0 Upgrade Guide]] for more information.
[[PT_Calendar_Version_3.0_Upgrade|PT Calendar v3.0 Upgrade Guide]] for more information.
 
 
 
<!-- === Features === -->
 
  
 
=== Enhancements ===
 
=== Enhancements ===
Line 21: Line 18:
 
=== SVN Change Log ===
 
=== SVN Change Log ===
 
For detailed SVN repository updates for the v4.0, please see the [[PT_Calendar_v4.0_Change_Log|PT Calendar v4.0 Change Log]].
 
For detailed SVN repository updates for the v4.0, please see the [[PT_Calendar_v4.0_Change_Log|PT Calendar v4.0 Change Log]].
 +
 +
<!-- === Features === -->

Revision as of 16:13, 5 May 2016

Back to PT Calendar

We are proud to release v4.0 to the Community.

Version 4.0 is compatible with the ADF 2.0 or greater and CommonSpot 10 or greater.

If installing the PT Calendar app for the first time, please follow the PT Calendar v4.0 Install Guide.

Note: PT Calendar v4.0 does not have a direct upgrade path from the v2.x or earlier Calendar App. Please see the PT Calendar v3.0 Upgrade Guide for more information.

Enhancements

Bug Fixes

SVN Change Log

For detailed SVN repository updates for the v4.0, please see the PT Calendar v4.0 Change Log.