Difference between revisions of "PT Calendar2 View Page Mapping"

From ADF Docs
Jump to: navigation, search
 
(2 intermediate revisions by one other user not shown)
Line 2: Line 2:
  
 
== Overview ==
 
== Overview ==
The Calendar View Page Mapping is used to store the mappings that is used to connect the links on the different calendar view pages correct calendar views by registering each page that contains the various calendar render handlers.
+
The Calendar View Page Mapping is used to store the mappings that are used to connect the links on the different calendar view pages to the correct calendar views by registering each page that contains the various calendar render handlers.
  
 
To configure Calendar Page Mappings for the All Events Pages complete the following steps.
 
To configure Calendar Page Mappings for the All Events Pages complete the following steps.
Line 10: Line 10:
 
# From the "Choose Main Subsite" drop down select the subsite where the calendar view pages will reside.
 
# From the "Choose Main Subsite" drop down select the subsite where the calendar view pages will reside.
 
# In each of the Calendar View select list fields (Detail, Daily, Weekly list, Weekly grid, Monthly list, Monthly grid) choose the page that contains the render handler was used for that the listed view page. In most cases the page selected for each will be in the same subsite that was selected in the "Choose Main Subsite" select list above.
 
# In each of the Calendar View select list fields (Detail, Daily, Weekly list, Weekly grid, Monthly list, Monthly grid) choose the page that contains the render handler was used for that the listed view page. In most cases the page selected for each will be in the same subsite that was selected in the "Choose Main Subsite" select list above.
 +
# Click Submit
 +
 +
[[Category:Calendar]]

Latest revision as of 23:33, 13 October 2010

Back to Build Subsites, Templates and Pages

Overview

The Calendar View Page Mapping is used to store the mappings that are used to connect the links on the different calendar view pages to the correct calendar views by registering each page that contains the various calendar render handlers.

To configure Calendar Page Mappings for the All Events Pages complete the following steps.

  1. Go to the web admin page you created for "Manage Calendar Page Mappings"
  2. Click "Add New Page Mapping"
  3. From the "Choose Main Subsite" drop down select the subsite where the calendar view pages will reside.
  4. In each of the Calendar View select list fields (Detail, Daily, Weekly list, Weekly grid, Monthly list, Monthly grid) choose the page that contains the render handler was used for that the listed view page. In most cases the page selected for each will be in the same subsite that was selected in the "Choose Main Subsite" select list above.
  5. Click Submit