Difference between revisions of "PT Calendar Version 2.1 Release Notes"
From ADF Docs
Gcronkright (talk | contribs) |
Gcronkright (talk | contribs) |
||
Line 7: | Line 7: | ||
If upgrading from v2.0, please follow the [[PT_Calendar_Version_2.1_Upgrade|v2.1 Upgrade Guide]]. | If upgrading from v2.0, please follow the [[PT_Calendar_Version_2.1_Upgrade|v2.1 Upgrade Guide]]. | ||
− | Also, due to architecture changes contained in the v2.x versions of the Calendar app there is NOT an upgrade path from previous versions prior to v2.0 | + | Also, due to architecture changes contained in the v2.x versions of the Calendar app there is NOT an upgrade path from previous versions prior to v2.0. Please install PT Calendar v2.1 as a fresh install using the [[PT_Calendar_Version_2.0_Install|v2.0 Install Guide]]. |
=== Enhancements === | === Enhancements === |
Revision as of 16:32, 27 February 2013
We are proud to release v2.1 to the Community.
Version 2.1 contains minor enhancements and bug fixes related to v2.0.
If installing the Calendar app for the first time, please follow the v2.0 Install Guide.
If upgrading from v2.0, please follow the v2.1 Upgrade Guide.
Also, due to architecture changes contained in the v2.x versions of the Calendar app there is NOT an upgrade path from previous versions prior to v2.0. Please install PT Calendar v2.1 as a fresh install using the v2.0 Install Guide.
Enhancements
Bug Fixes
SVN Change Log
For detailed SVN repository updates for the v2.1, please see the PT Calendar v2.1 Change Log.