Difference between revisions of "PT Calendar Version 3 Release Notes"

From ADF Docs
Jump to: navigation, search
(Bug Fixes)
(Enhancements)
Line 10: Line 10:
 
PT Calendar v3.0 does not have an upgrade path from v2.x or earlier. Please see the [[PT_Calendar_Version_3.0_Upgrade|PT Calendar v3.0 Upgrade Guide]] for more information.
 
PT Calendar v3.0 does not have an upgrade path from v2.x or earlier. Please see the [[PT_Calendar_Version_3.0_Upgrade|PT Calendar v3.0 Upgrade Guide]] for more information.
  
=== Enhancements ===
+
=== Features ===
* Removed the Date app level override Lib component and redirected scripts function calls back ADF 1.6's date_1_2 lib
 
* Removed the Scripts app level override lib component and redirected scripts function calls back ADF 1.6's scripts_1_2 lib
 
* Moved the non-ADF scripts functions to a new socialMeidaService component
 
* Updated the App Bean Config v3.0 to support ADF v1.6.
 
  
 
=== SVN Change Log ===
 
=== SVN Change Log ===
 
For detailed SVN repository updates for the v3, please see the [[PT_Calendar_Version_3.0_Change_Log|PT Calendar v3.0 Change Log]].
 
For detailed SVN repository updates for the v3, please see the [[PT_Calendar_Version_3.0_Change_Log|PT Calendar v3.0 Change Log]].

Revision as of 15:05, 1 March 2013

Back to PT Calendar

We are proud to release v3 to the Community.

Version 3 is compatible with the ADF v1.6.

If installing the PT Calendar app for the first time, please follow the PT Calendar v3.0 Install Guide.

PT Calendar v3.0 does not have an upgrade path from v2.x or earlier. Please see the PT Calendar v3.0 Upgrade Guide for more information.

Features

SVN Change Log

For detailed SVN repository updates for the v3, please see the PT Calendar v3.0 Change Log.