Difference between revisions of "PT Calendar Version 3 Release Notes"
From ADF Docs
Gcronkright (talk | contribs) (→Bug Fixes) |
Gcronkright (talk | contribs) (→Enhancements) |
||
Line 10: | Line 10: | ||
PT Calendar v3.0 does not have an upgrade path from v2.x or earlier. Please see the [[PT_Calendar_Version_3.0_Upgrade|PT Calendar v3.0 Upgrade Guide]] for more information. | PT Calendar v3.0 does not have an upgrade path from v2.x or earlier. Please see the [[PT_Calendar_Version_3.0_Upgrade|PT Calendar v3.0 Upgrade Guide]] for more information. | ||
− | === | + | === Features === |
− | |||
− | |||
− | |||
− | |||
=== SVN Change Log === | === SVN Change Log === | ||
For detailed SVN repository updates for the v3, please see the [[PT_Calendar_Version_3.0_Change_Log|PT Calendar v3.0 Change Log]]. | For detailed SVN repository updates for the v3, please see the [[PT_Calendar_Version_3.0_Change_Log|PT Calendar v3.0 Change Log]]. |
Revision as of 15:05, 1 March 2013
Back to PT Calendar
We are proud to release v3 to the Community.
Version 3 is compatible with the ADF v1.6.
If installing the PT Calendar app for the first time, please follow the PT Calendar v3.0 Install Guide.
PT Calendar v3.0 does not have an upgrade path from v2.x or earlier. Please see the PT Calendar v3.0 Upgrade Guide for more information.
Features
SVN Change Log
For detailed SVN repository updates for the v3, please see the PT Calendar v3.0 Change Log.