Difference between revisions of "PT Calendar Version 3 Upgrade"

From ADF Docs
Jump to: navigation, search
(Overview)
Line 2: Line 2:
  
 
== Overview ==
 
== Overview ==
Due to major architecture changes with the code base and custom element data structure contained in the v3.0 version of the PT Calendar app there is '''NOT''' an upgrade path from previous versions. Please install PT Calendar v3.0 as a fresh install using the [[PT_Calendar_Version_3.0_Install|v3.0 Install Guide]].
+
Due to major architecture changes with the code base and custom element data structure contained in the v3.0 version of the PT Calendar app there is '''NOT''' a direct upgrade path from previous versions. Please install PT Calendar v3.0 as a fresh install using the [[PT_Calendar_Version_3.0_Install|v3.0 Install Guide]].
  
PT Calendar v3.0 (pt_calendar) and PT Calendar v2.x  (pt_calendar2) can be installed side by side as two separate apps in the ADF and running in the same site.   
+
PT Calendar v3.0 (pt_calendar) and PT Calendar v2.x  (pt_calendar2) can be installed side by side as two separate apps in the ADF and configured to run in the same site.   
  
 
=== Data Migration ===
 
=== Data Migration ===
Due significant changes in the custom element data structure, moving event and other app data from the older v2.x to the new v3.0 it is NOT a one-to-one export/import opperation.
+
Due significant changes in the custom element data structure, moving event and other app data from the older v2.x to the new v3.0 it is NOT a one-to-one export/import operation.
Moving the data is possible with custom coding and using the CommonSpot CCAPI but there are some challenges involved in the process.  
 
  
If you need help with moving v2.x data into a v3.0 Calendar App install please contact your PaperThin Account Rep to find out how our Services Team can assist.  
+
Moving the data is possible with custom coding and using the CommonSpot CCAPI but there are some challenges involved with this process.
 +
 
 +
If you need help with data migration from PT Calendar v2.x into a v3.0 Calendar App install please contact your PaperThin Account Rep to find out how our Services Team can assist in this process.  
  
 
[[Category:Calendar]]
 
[[Category:Calendar]]

Revision as of 19:44, 28 February 2013

Back to PT Calendar

Overview

Due to major architecture changes with the code base and custom element data structure contained in the v3.0 version of the PT Calendar app there is NOT a direct upgrade path from previous versions. Please install PT Calendar v3.0 as a fresh install using the v3.0 Install Guide.

PT Calendar v3.0 (pt_calendar) and PT Calendar v2.x (pt_calendar2) can be installed side by side as two separate apps in the ADF and configured to run in the same site.

Data Migration

Due significant changes in the custom element data structure, moving event and other app data from the older v2.x to the new v3.0 it is NOT a one-to-one export/import operation.

Moving the data is possible with custom coding and using the CommonSpot CCAPI but there are some challenges involved with this process.

If you need help with data migration from PT Calendar v2.x into a v3.0 Calendar App install please contact your PaperThin Account Rep to find out how our Services Team can assist in this process.